The Burnside Bridge is a 1926-built that spans the in Portland, Oregon, United States, carrying . It is the second bridge at the same site to carry that name. It was added to the National Register of Historic Places in November 2012.


Design
The bridge was designed by Ira G. Hedrick Ira Grant Hedrick, Designer of Bridges; Built the Burnside Lift Span at Portland, Ore.-Firm Did Work in Mexico-Dies at 69. The New York Times. and Robert E. Kremers, incorporating a lift mechanism designed by Joseph Strauss.
(2026). 9780978736514, Urban Adventure Press.

Including approaches, the Burnside has a total length of and a center span. While lowered, this span is normally above the river. The deck is made of concrete, which contributes to its being one of the heaviest bascule bridges in the United States. The , housed inside the two piers, weigh . The lifting is normally controlled by the operator, but an operator staffs the west tower during high river levels. As of 2005, the bridge opened for river traffic an average of 35 times a month.

The bridge provides shelter for the initially unauthorized Burnside Skatepark under the east end. On weekends, the Portland Saturday Market was held mostly under the bridge's west end for many years. The market was reoriented in 2009, but the Burnside Bridge continues to provide shelter for a few vendor stalls at the market's northern end.


History
In 1891, was renamed from "B" street to take the name of Dan Wyman Burnside, a local businessman who was a proponent of the 1866 of the Willamette River. Construction of the original Burnside Bridge began in November 1892, and the bridge opened on July 4, 1894.
(1976). 9780891740438, The Georgian Press Company.
It was a made of wrought iron and steel.
(2026). 9780738548760, Arcadia Publishing. .

The replacement was part of a $4.5 million bond that also included the construction of the Ross Island and bridges. The public would later learn that the 1924 contract was given for $500,000 more than the lowest bid. Having moved the bridge location to profit by selling their land, three commissioners were recalled as a result of the scandal, and a new engineering company assumed control of the project. The Ku Klux Klan had backed the commissioners and enabled their system of kickbacks and grafts; the ensuing "rotten bridge scandal" removed much of their clout even by 1924.

(2026). 9781467119535, The History Press.

The bridge opened on May 28, 1926, at a final cost of $4.5 million (including approaches). It was the first Willamette River bridge in Portland designed with input from an architect. This led to the Italian Renaissance towers and decorative metal railings. The bascule system was designed by Joseph Strauss. The initial principal engineer for the bridge construction was the firm of Hedrick & Kremers. The bridge was then completed by Gustav Lindenthal,

(1989). 9780875952055, Oregon Historical Society Press.
who also supervised its construction.

crossed the Burnside Bridge until 1950,Hatch, Tom (February 27, 1980). "End of lines 30 years ago: New 'trolleys' can't beat old ones". The Oregonian, p. D7. and serving the Sandy Blvd. route did so from 1936 to 1958.; and Ward, Paul (1974). The Trolley Coach in North America (Interurbans Special 59). Los Angeles: . LCCN 74-20367. Currently, three bus routes use the bridge.

In the 1990s the Burnside Bridge was made a Regional Emergency Transportation Route, the one non-freeway bridge to be used by emergency vehicles. In 1995 one of the six lanes was removed to accommodate new bicycle lanes. From March until November 2002 the bridge underwent a $2.1 million seismic retrofit, making it the first bridge operated by Multnomah County to receive earthquake protection.

The bridge was under construction in 2006 in order to replace the deck. The electric streetcar tracks, abandoned in 1950, were visible during the construction. This project was budgeted at $9 million and the majority of the work was completed on December 9, 2007. The bridge was added to the National Register of Historic Places in November 2012.

The Eastbank Esplanade, which opened in 2001, is connected to the bridge by stairs added during the esplanade's construction. However, because of the bridge's age, it cannot support any extra weight, so the stairways must be supported by separate pilings.

In 2020, the Earthquake Ready Burnside Bridge project deemed that the current short-span bridge would not survive a major earthquake, and recommended a replacement long-span bridge. Early concepts for the new bridge included designs that resembled nearby Willamette River bridges; the six finalists, organized into cable-stayed and designs, were presented for a public vote in July 2024. The replacement is estimated to cost $895 million and would begin construction in 2026; it is scheduled to open by 2031.


See also
  • Joseph Strauss (engineer)
  • List of bascule bridges
  • List of bridges documented by the Historic American Engineering Record in Oregon
  • List of bridges on the National Register of Historic Places in Oregon
  • List of crossings of the Willamette River


External links

Page 1 of 1
1
Page 1 of 1
1

Account

Social:
Pages:  ..   .. 
Items:  .. 

Navigation

General: Atom Feed Atom Feed  .. 
Help:  ..   .. 
Category:  ..   .. 
Media:  ..   .. 
Posts:  ..   ..   .. 

Statistics

Page:  .. 
Summary:  .. 
1 Tags
10/10 Page Rank
5 Page Refs
1s Time